About Shangri-La Ulaanbaatar project

Shangri-La Ulaanbaatar will be located at the heart of the capital’s business, cultural and financial district. Opening a branch of this international luxury hotel chain gives visitors more choice in the burgeoning luxury tourism market. The two towers of the hotel will be connected via a five-storey shopping mall. During construction we used a double girder crane monorail system for the facade installation, a first in Mongolia. Currently there are 7 subcontractors working on the construction site and NBIK LLC is one of them.

Phase 1

NBIK LLC started to work on phase on December 2012.
To this day we have completed a total of 200 tonnes of steel structure on phase 1’s All day dining area, Lobby Lounge, Main Lobby, Ballroom, Mini Tower and Landscape Deck.

Completed works on Phase 1


1. Shangri-La Phase I: Steel structure fabrication and installation /300 tons/
2. Drilling for Steel structure
Our workers are experienced in all types of drilling, Our workers provided excellent quality results within a tight-schedule.
3. Gondola system
As the installation of the Monorail system requires a platform for our workers at great heights, we are required to install the Gondola System.
4. Monorail system
We professionally executed the installation of the Monorail System at the top floor of the Shangri-La building; our workers are experienced in working at great heights to deliver precise and quick results of excellent quality.

Phase 2

Phase 2 construction comprises of a 24-story office tower, a Valley Wing 34-storey, 200-room luxury hotel and serviced apartments, a 5-storey shopping mall. The shopping mall will include an 8-hall cinema, an arcade and video game hall, a fully-equipped modern fitness club, international chain food & beverage outlets and many more.
NBIK LLC started work on phase 2 with 50 skilled rebar workers and carpenters on March 2014.
Currently 160 skilled workers of NBIK is working on Phase 2 of Shangri La Ulaanbaatar.

Ongoing works on Phase 2


1. Team of 150 experienced workers are working on Concrete Steel Structure of Shangri-La project.
2. 10 skilled interior design workers are working on Shangri-La project.
3. 10 skilled electrical workers are working on Shangri-La project.
4. 10 skilled and qualified plumbing workers are working Shangri-La.